BlogReference

OWASP Agentic Top 10 mapped to required controls

The OWASP Agentic Top 10 names the threats. This piece maps each one to the controls that close it, the lifecycle gate where each control must be in place, and the evidence required to verify it — so your AI Committee has a working checklist, not just a threat list.

Drel14 min read

The OWASP Top 10 for Agentic Applications (2026), published by the OWASP GenAI Security Project in December 2025, is the most useful public reference for the specific threat class that traditional AppSec tools miss: agents that plan, delegate, call tools, retrieve from memory, and act in the world with varying degrees of autonomy.

The problem with a Top 10 list is that it names threats without telling you what to do about them. Security teams reading it know that ASI01 (Agent Goal Hijack) is a problem. They do not know which controls close it, which controls must be in place before a pilot, and what evidence they need to show an auditor that the control is actually working.

This piece fills that gap. For each of the ten entries, we map the required controls, assign a lifecycle gate (before pilot / before production / ongoing), and specify the evidence required to verify the control. The full table is below. The sections before it explain the framework we used to build it.

Why the Agentic Top 10 is different from the LLM Top 10

The OWASP LLM Top 10 covers risks in LLM-backed applications: prompt injection, sensitive information disclosure, improper output handling, unbounded consumption, and so on. These are real and important. But they assume a relatively simple architecture: a user sends a prompt, the model responds, the application does something with the response.

Agentic systems break this assumption. An agent does not just respond — it plans, selects tools, calls them, receives results, updates its internal state, and continues. It may delegate to sub-agents. It may retrieve from a memory store that persists across sessions. It may call external APIs with real-world effects. The attack surface is not a single prompt-response pair; it is a graph of decisions, tool calls, and state transitions.

Agentic attack surface — where each OWASP ASI risk lives

Each layer is an independent attack surface. Controls must be applied at the layer where the threat originates, not only at the output.

The diagram above shows the five layers of the agentic attack surface. Each layer is independent: a control at the output layer does not protect against a memory poisoning attack at the memory layer. This is why the Agentic Top 10 requires a different control set from the LLM Top 10, and why controls must be applied at the layer where the threat originates.

The three lifecycle gates

We assign each control to one of three gates. The gate determines when the control must be in place — not when it should be planned, but when it must be verified.

  • Before pilot — must be in place before the system is used by any real user, even in a restricted scope. These are the controls without which the pilot itself is unsafe.
  • Before production — must be in place before the system serves its full intended user population. These controls are acceptable to defer during a tightly scoped pilot but not beyond it.
  • Ongoing — must remain in place for as long as the system operates. These are operational controls: monitoring, auditing, rotation, periodic review.

Evidence is not the same as implementation

Every control in the table below has an evidence field. This is not optional. A control that is “implemented” without evidence is a claim. A control with evidence is a verifiable fact.

Evidence takes different forms depending on the control type:

  • Architecture review — a documented review of the system design showing the control is present.
  • Test result — an automated or manual test that demonstrates the control works under adversarial conditions.
  • Log sample — a representative sample of log output showing the required fields are populated.
  • Policy document — a written policy that governs the control, with a named owner and review date.
  • Audit report — a periodic review showing the control was checked and found effective.

When a control's evidence is missing, the control is in the “missing evidence” state in Drel's evidence ledger. It does not count toward the disposition until the evidence is attached and verified.

Which threats require the most controls

Before the full table, a quick orientation: not all threats are equally expensive to close. ASI01 (Agent Goal Hijack) requires the most controls because it can be exploited at every layer of the agentic stack. ASI10 (Rogue Agents) needs as many, and its controls — trace IDs, tamper-evident logs, scope audits, a kill switch — are the most commonly skipped: they feel like operational hygiene rather than security, which is exactly why they end up in incident reports.

Required controls per threat — minimum viable control set

ASI01 · Agent Goal Hijack
6
ASI02 · Tool Misuse and Exploitation
6
ASI03 · Identity and Privilege Abuse
5
ASI04 · Agentic Supply Chain Vulnerabilities
4
ASI05 · Unexpected Code Execution
4
ASI06 · Memory and Context Poisoning
5
ASI07 · Insecure Inter-Agent Communication
4
ASI08 · Cascading Failures
4
ASI09 · Human-Agent Trust Exploitation
3
ASI10 · Rogue Agents
6

ASI01 (Agent Goal Hijack) requires the most controls because it can be exploited at every layer. ASI10 (Rogue Agents) needs as many, and its controls are the most commonly skipped.

The full control map

The table below covers all ten entries. Each row is one control. Controls are grouped by threat. The gate column uses color coding: amber for before-pilot, red for before-production, gray for ongoing.

This is a minimum viable control set — the floor, not the ceiling. Systems with higher criticality, broader user populations, or access to sensitive data will require additional controls beyond what is listed here.

IDThreatRequired controlGateEvidence required
ASI01Agent Goal Hijack

Malicious instructions embedded in user input, retrieved documents, or tool responses redirect the agent toward a goal the operator did not intend.

System prompt and user input separated at the model gateway (not concatenated as one string)Before pilotArchitecture review showing gateway separation
Retrieved documents and tool responses treated as untrusted data, not as instructionsBefore pilotPrompt template review confirming data/instruction boundary
Tool responses validated before being passed back to the plannerBefore pilotValidation schema + test cases with adversarial tool responses
Goal-critical decisions (scope changes, new objectives) require human confirmationBefore pilotConfirmation boundary implementation + test
Red-team exercise covering indirect injection and gradual goal displacementBefore productionRed-team report with findings and mitigations
Automated detection of goal drift and instruction-following anomaliesOngoingDetection rule + test trigger
ASI02Tool Misuse and Exploitation

Agent uses legitimate tools outside their intended scope, with unintended parameters, or in sequences that cause irreversible real-world effects.

Tool manifest defines allowed parameter ranges and types; agent cannot call outside manifestBefore pilotTool manifest + enforcement test
Irreversible actions flagged in the tool manifest and require human approval before executionBefore pilotManifest showing irreversible flag + approval flow test
External calls (email, webhook, HTTP) restricted to an explicit allowlistBefore pilotAllowlist config + test showing unlisted calls blocked
Tool call log captures full invocation (tool id, parameters, caller, timestamp)Before pilotLog sample with all fields populated
Rollback procedure documented for each irreversible toolBefore productionRollback runbook
Periodic review of tool call logs for out-of-scope invocationsOngoingReview schedule + last-run findings
ASI03Identity and Privilege Abuse

Agent acquires or exercises permissions beyond its grant — through injected permission claims, reused credentials, or acting as a confused deputy for a less-privileged user.

Agent identity has a fixed, minimal permission set; no runtime permission expansionBefore pilotIAM policy review showing least-privilege grant
Agent authenticates to downstream services with its own identity, not a reused user tokenBefore pilotAuth flow review showing agent identity used
Retrieval and data access scoped to what the requesting user is authorized to seeBefore pilotAuthorization test: user A cannot retrieve user B's data
Permission changes require out-of-band approval (not agent-initiated)Before productionChange management process + test
Agent credentials rotated and permission grants reviewed on a defined scheduleOngoingRotation schedule + last review report
ASI04Agentic Supply Chain Vulnerabilities

A model, framework, plugin, or MCP server the agent depends on is compromised or returns altered tool definitions.

Inventory of models, frameworks, plugins, and MCP servers, each with a named sourceBefore pilotSupply chain inventory
Tool definitions validated against the approved version at load timeBefore pilotLoad-time validation + test with an altered descriptor
Dependencies and model artifacts pinned with integrity verificationBefore productionPinning config + integrity check log
Any component update triggers re-review before useOngoingChange trigger + last re-review record
ASI05Unexpected Code Execution

Agent generates or runs code — through an interpreter, shell, or test runner — and an attacker steers what that code does.

Code runs in a sandbox with no network egress and no credentials by defaultBefore pilotSandbox config + egress test
Model output validated before it reaches any interpreter, shell, or query engineBefore pilotValidation implementation + test with injected payloads
Generated code that runs outside the sandbox requires human reviewBefore productionReview gate + sample approvals
Execution log for all code runs, retained for 90 days minimumOngoingLog retention policy + sample
ASI06Memory and Context Poisoning

Attacker injects malicious content into the agent's memory store or context, causing persistent misbehavior across sessions.

Memory write access restricted to trusted sources onlyBefore pilotAccess control policy + code review
Memory contents validated against schema before read-backBefore pilotSchema validation test suite
Memory store isolated per user/session (no cross-session bleed)Before pilotIsolation test: session A cannot read session B
Memory contents logged with source attributionBefore productionLog sample showing source field populated
Periodic memory audit for anomalous contentOngoingAudit schedule + last-run report
ASI07Insecure Inter-Agent Communication

Messages between agents are not authenticated or authorized, so they can be spoofed and a compromised agent can steer the others.

Messages between agents authenticated (signed tokens or mutual TLS)Before pilotAuth mechanism + test with a spoofed message
Delegation chains are bounded: agent cannot grant permissions it does not holdBefore pilotDelegation policy + test showing escalation blocked
Orchestrator treats sub-agent output as untrusted dataBefore pilotOrchestrator template review + adversarial test
Agent trust model reviewed whenever an agent is added to the graphOngoingAgent graph + last review record
ASI08Cascading Failures

A single fault — a hallucinated value, a poisoned entry, a runaway loop — propagates across steps and agents, amplifying at each hop.

Intermediate outputs validated at step and agent boundariesBefore pilotBoundary validation points in the agent graph + test
Tool call and sub-agent spawning rate limits per session to prevent runaway loopsBefore productionRate limit config + test showing enforcement
Per-session budget caps (tokens, API calls, cost) with a hard stopBefore productionBudget config + test showing the stop
Circuit breaker alerts and halts the workflow when error or spend thresholds are crossedOngoingAlert rule + test trigger
ASI09Human-Agent Trust Exploitation

Reviewers over-trust confident agent output or approve by habit, so a harmful action gets human sign-off.

Approval prompts show the actual action and parameters, not only the agent's summaryBefore pilotApproval screen sample + test
High-impact actions routed to a second reviewerBefore productionApproval policy + routing test
Approval volume per reviewer monitored for rubber-stamping patternsOngoingApproval metrics + last review
ASI10Rogue Agents

Agent acts outside its approved mandate — through compromise, drift, or unreviewed scope growth — and nobody can see or stop it.

Scope is defined in the decision memo and any expansion triggers re-reviewBefore pilotDecision memo with scope definition and re-assessment trigger
Every agent action carries a trace ID linking it to the originating user sessionBefore pilotTrace ID present in log sample
Audit log is append-only and tamper-evidentBefore productionLog integrity mechanism + test
Tested kill switch stops the agent and revokes its credentialsBefore productionKill switch test record
Quarterly audit comparing actual actions and scope to the approved mandateOngoingAudit schedule + last-run report
Audit log retained for minimum 12 monthsOngoingRetention policy + log age verification
47 controls across 10 threat categories. Gate colors: amber = before pilot, red = before production, gray = ongoing.

When a threat is not applicable

Not every threat applies to every agentic system. A stateless RAG pipeline with no tool calls has no exposure to ASI02 (Tool Misuse and Exploitation) or ASI05 (Unexpected Code Execution). A single-agent system has no exposure to ASI07 (Insecure Inter-Agent Communication).

The correct response to a non-applicable threat is not to skip it silently — it is to mark it as not applicable with a stated reason. “ASI02 not applicable: this system has no tool calls; it retrieves from a single read-only vector store and returns a response.” That sentence is evidence. It tells the auditor that the team considered the threat and made a reasoned determination, not that they forgot to look.

A not-applicable determination with a stated reason is evidence. A missing row is a gap.

From control map to disposition

The control map is an input to the disposition, not the disposition itself. Once you have gone through the table and identified which controls are in place, which are planned, and which are missing, you have the raw material for the required-controls section of the Decision Memo.

Controls in the before-pilot column that are not yet in place become conditions on the disposition: the pilot cannot start until they are verified. Controls in the before-production column that are not yet in place become conditions on the production release. Controls in the ongoing column that are not yet in place become evidence gaps with a closure plan.

If you are not familiar with the structure of a decision memo, the previous piece in this series — What an AI Risk Disposition actually contains — walks through it section by section.

Run this control map on your own system

Drel applies the OWASP Agentic Top 10 control map — and six other frameworks — to your assessed system automatically. The output is a structured decision memo with required controls, evidence gaps, and re-assessment triggers.

Blog

Get new posts in your inbox

AI security review, OWASP Agentic Top 10, ISO 42001 evidence, and what AI Committees actually need. No cadence promises — we publish when there's something worth reading.

A note on scope: Drel reviews assessed systems against documented architecture, configuration and intent. It does not ingest live telemetry from production environments. Dispositions reflect the assessed system at the time of review and the re-assessment triggers that govern when the disposition must be revisited.