Free resourceSpreadsheet

Agentic AI Risk Register Template

One risk register per agentic system, pre-populated with ten rows across five OWASP Agentic Top 10 items (ASI01, ASI02, ASI03, ASI06, ASI10) plus system-specific risk slots. Each row carries an attack path (not just a description), the inherent risk before controls, the controls applied, residual risk after controls, and a named acceptor for any accepted residual risk.

12pre-populated risks
10OWASP Agentic Top 10 rows
2system-specific examples
13columns

Get the spreadsheet

Enter your email to download

Excel format (.xlsx). Two sheets: how-to guide and the working risk register. Opens in Excel, Google Sheets, or any spreadsheet tool. You'll also receive new blog posts when they publish.

Free. No credit card.

Who it's for

Security architects, AI governance leads, and AppSec teams preparing an agentic AI system for pilot or production review.

Use it per system — one register per agentic deployment under review. The pre-populated OWASP Agentic rows are a starting point; add system-specific risks as needed.

How to use it

  1. 1Identify the agentic system: orchestrator, tools, memory, identity model.
  2. 2For each pre-populated OWASP Agentic row, mark Applicable? and assess Likelihood / Severity for your system.
  3. 3Add system-specific risks beyond the OWASP Agentic Top 10.
  4. 4Document the Attack Path — how a threat actor would realize this risk in your system.
  5. 5Document Residual Risk after controls and name the acceptor.
  6. 6Treat any High inherent risk without a Covered control as a review blocker.

What's in the file

Each pre-populated row covers one OWASP Agentic threat, with example controls and risk ratings ready to adapt to your system. Two system-specific rows show how to add risks beyond the Top 10 (vendor model change, regulatory exposure).

Column groupContents
Risk ID + CategoryMaps to OWASP Agentic Top 10 or system-specific category
Attack SurfaceOrchestrator / Memory / Tool surface / Identity / Output / Supply chain
Risk Description + Attack PathWhat could go wrong AND how a threat actor would realize it
Likelihood + Severity + Inherent RiskPre-control risk rating
Controls AppliedReferences to your control plan IDs
Residual Risk + AcceptancePost-control risk, acceptance status, named acceptor

From risk register to evidence pack

Spreadsheets are the starting point

This register helps document agentic AI risks and the controls that address them. In Drel, your AppSec lead runs the review: Drel models the agent from its repository, threat-models every attack path, checks the controls it can verify in your code, proposes each fix in the Jira ticket and checks the merged pull request, and re-checks the automatic checks you turn on when the branch you link changes. Your AI Committee signs the security approval.

Frequently asked questions

What makes this different from a generic risk register?
Three things: pre-populated OWASP Agentic Top 10 rows so you don't start from a blank page; an Attack Path column that forces you to describe how a threat actor would realize the risk (not just the category name); and a named Acceptor column for any residual risk, so accountability is explicit.
Should I treat the pre-populated risks as definitive for my system?
No. They are starting points. Mark Applicable? for each row, adjust likelihood and severity based on your specific system, and add system-specific risks beyond the Top 10 (supply chain specifics, regulatory exposure, business-context risks). Don't delete rows you decide are not applicable — mark them N/A with a one-line rationale.
How does this relate to the OWASP Agentic Top 10 Control Map?
The risk register names the risks; the control map names the controls. Use them together: for each risk in your register, identify which controls from the control map address it. The Controls Applied column references your control plan IDs.
Who should be the Acceptor for residual risk?
Someone with authority to accept consequences. For most accepted residual risks, this is the AI Committee or its delegate (CISO, AI Governance Officer). For risks that affect product strategy, it may be a product or business owner. The point is that an accepted risk has a named owner — not 'the team'.
Does this map to ISO 42001 or EU AI Act?
The register supports ISO 42001 clause 6.1.2 (risk assessment: identification, analysis and evaluation) and 6.1.3 (risk treatment), and supports Article 9 risk record evidence for high-risk AI under the EU AI Act.
How often should this be re-reviewed?
On a regular cadence (quarterly is common) and on any re-assessment trigger fired by changes to the system: new tool, new data source, new model, scope expansion, vendor change. The register is a live artifact, not a one-time deliverable.